彩钢夹芯板的施工步骤是什么

来源:http://www.jnhscg.com 日期:2022-09-17

彩钢夹芯板安装并不是一件很容易的事情,一般都需要严格按照按照步骤施工的,不然就会容易犯错,影响正常的使用,那么彩钢夹芯板的施工步骤是什么?下面济南彩钢夹芯板厂给您讲讲。

It is not easy to install color steel sandwich panels. Generally, the construction should be carried out in strict accordance with the steps, otherwise it will be easy to make mistakes and affect the normal use. What are the construction steps of color steel sandwich panels? Next, Jinan Color Steel Sandwich Panel Factory will tell you something.

1、看懂图纸,仔细检查平面布置,节点要求,彩钢夹芯板与建筑物的连接处,彩钢夹芯板本身的光泽度,填充物,基本尺寸要求,门窗尺寸及布置彩钢夹芯板隔板、辅材种类等内容。

1. Understand the drawings, carefully check the plane layout, node requirements, the connection between the color steel sandwich panel and the building, the glossiness of the color steel sandwich panel itself, the filler, the basic size requirements, the size of doors and windows, the layout of the color steel sandwich panel partition, the type of auxiliary materials, etc.

2、二次布置图是彩钢夹芯板预制安装中的重要一步,是将规划图转换成工厂二次加工的转换图,将标准尺寸的板材做成不同的墙板的类型,并将它们组合起来以反映程序意图。标准尺寸钢板在彩钢夹芯板厂生产净化,在施工现场组装,既能保证板材的牢固性,又能加快彩钢夹芯板的安装速度。

2. The secondary layout plan is an important step in the prefabrication and installation of color steel sandwich panels, which is to convert the planning plan into the central conversion plan for secondary processing in the factory, make the standard size panels into different types of wallboards, and combine them to reflect the program intent. The standard size steel plates are produced and purified in the color steel sandwich panel plant and assembled at the construction site, which can not only ensure the firmness of the plates, but also speed up the installation of color steel sandwich panels.

20210807437202.jpg

3、在工厂预制时,根据经验,应充分考虑门洞、窗洞和接缝之间的间隙和设备余量。在整个运输、制造和安装过程中避免划痕、重压和表面撞击,以防止无法修复的凹痕和划痕。净化后的彩钢夹芯板两面的塑料保护膜只有在设备清洗干净后才能去除。

3. When prefabricating in the factory, the gap and equipment allowance between door openings, window openings and joints shall be fully considered according to experience. Avoid scratches, heavy pressure and surface impact during the whole transportation, manufacturing and installation process to prevent irreparable dents and scratches. The plastic protective film on both sides of the cleaned color steel sandwich panel can only be removed after the equipment is cleaned.

4、彩钢夹芯板装置净化前的打桩作业,应在装置的地面(建筑)面等相关条件完成后进行。比如大型设备已经运输到位,隐蔽地面管线进行了调整,设备运行基本完成。放样是标出彩钢夹芯板板的水平投影和门窗在地面上的位置。

4. The piling operation before the purification of color steel sandwich panel device shall be carried out after the completion of relevant conditions such as the ground (building) surface of the device. For example, large equipment has been transported in place, concealed ground pipelines have been adjusted, and equipment operation has been basically completed. Setting out is to mark the horizontal projection of color steel sandwich panel and the position of doors and windows on the ground.

5、按放样比例固定铝槽。

5. Fix the aluminum groove according to the setting out proportion.

6、搭建彩钢夹芯板,按照线条图安装预制构件,构件之间用固定嵌件确定相邻墙板。

6. Build color steel sandwich panels, install prefabricated components according to the line diagram, and determine adjacent wallboards with fixed inserts between components.

以上就是彩钢夹芯板的施工步骤是什么的知识问题讲解就先说到这里了,相信大家看了以后应该会有更多的认识了吧,内容仅供大家参考,希望能对大家有所帮助。更多了解关注我们http://www.jnhscg.com吧!

The above is the knowledge of what the construction steps of color steel sandwich panels are. I believe you will have more understanding after reading it. The content is only for your reference, and I hope it can help you. Learn more Follow us http://www.jnhscg.com Come on!